Skip to content

8.1 Restart the calculation you actually have

These are unexecuted teaching inputs and starting models. Original diagrams are schematics, not calculated results. Validate version-specific syntax, licensed or authorized data, numerical convergence and the scientific model before using this workflow.

8.1.1 Model, units and provenance

Geometry in Å; electronic energy in hartree; vibrational wavenumbers in cm⁻¹. Check each printed field and keep thermal and standard-state terms distinct.

Shared inputs, conventions and evidence

Original schematic: Restart the calculation you actually have. No numerical results are claimed.
Original schematic: Restart the calculation you actually have. No numerical results are claimed.

8.1.2 Unexecuted inputs and explicit deltas

Use the accompanying instructions to identify the parent calculation and placement of every delta; a snippet is not automatically a standalone input. Preserve all blank-line and file-provenance requirements.

8.1.2.1 Input block 1

%chk=g29_water_restart.chk
%mem=2GB
%nprocshared=2
#p Opt=Restart

8.1.2.2 Input block 2

%oldchk=g29_water_interrupted.chk
%chk=g29_water_freshopt.chk
%mem=2GB
%nprocshared=2
#p B3LYP/6-31G(d) Opt=(Tight,CalcFC) Geom=AllCheck Guess=Read SCF=Tight Int=UltraFine

8.1.3 Worked investigation

8.1.3.1 Intuition and prerequisites

“Restart” can mean three different things: continue an optimizer's saved state, start a new optimization from saved coordinates, or repeat an electronic calculation with a saved orbital guess. They require different data. This case begins with a backup copy of an interrupted optimization checkpoint. A scheduler kill can leave a readable geometry but incomplete optimizer state, so checkpoint presence alone is insufficient evidence. Do not overwrite your only recovery copy. Prerequisites: cases 04 and 08 and an actual test job stopped by a supported controlled limit, not by corrupting files.

8.1.3.2 Original recovery branches

For a compatible interrupted optimization with valid saved optimizer state, use a fresh copy as the active checkpoint:

See input block 1 above.

For a new optimization from the latest readable geometry, first copy the source through %oldchk:

See input block 2 above.

The first input assumes g29_water_restart.chk already contains a copied compatible interrupted state; an empty file of that name will not work. The second explicitly chooses a new optimization and its model. Neither requires an added title or geometry under the shown layout. /

8.1.3.3 Workflow

  1. Diagnose why the job stopped using both Gaussian and scheduler logs: wall time, memory, disk, requested step limit, SCF failure, or geometry failure.
  2. Archive the original input/log/checkpoint and record sizes/checksums before testing recovery.
  3. Verify that formchk can read a copy and inspect the last geometry. A successful conversion does not certify every restart record.
  4. Choose the continuation branch only when the method and optimizer state are compatible; otherwise choose the clearly labeled fresh optimization branch.
  5. Compare the resumed geometry and settings with the last reliable step. A jump to the original starting structure signals an incorrect file or extraction.
  6. After completion, run a matching frequency check and preserve the link between original and recovery records.

8.1.3.4 Interpret check and limits

A fresh Opt is not the same computational trajectory as Opt=Restart, even if both reach the same endpoint. Recovered geometry does not imply recovered SCF or optimizer history. %oldchk protects provenance only when the new %chk is genuinely a different path. Some tasks, including IRC and numerical derivatives, have their own restart options and scratch requirements; do not apply the optimizer recipe universally. Changing basis, electronic state, solvent, or constraints is a new model step, not an invisible continuation. A checkpoint obtained from an incompatible release or platform may need supported conversion rather than direct reuse.

Exercise Write a recovery decision note for a job killed by wall time after its last SCF but before a geometry step completes. State what is known, what must be inspected, and why you cannot claim the interrupted step was saved.

8.1.5 Sources and further reading